CHI
|
ENG
|
RU

News

Construction of Polymer Plant in Ust-Kut

We are consistently expending our presence in the market and currently our staff have got an excellent opportunity to participate in new interesting project executed by Irkutsk Polymer Plant LLC (100% branch of Irkutsk Oil Company).

Our Client, Toyo Engineering Corporation, Japanese engineering company, is rendering construction coordination, planning and control services.

The polymer plant is to be commissioned in 2023. The estimated annual scope of production is 650 K t.
In general, the Irkutsk Oil Company’s gas program will ensure more than 2400 permanent workplaces while the high-tech production and the availability of engineering and transport infrastructure will be a good support for development of new companies including small and mid-sized enterprises in Ust-Kut.

We are glad to be a part of this large-scale project and have no doubts that the staff provided by our company will be helpful during the whole period of construction.
16.12.2020


Last Projects

Amur Gas Processing Plant Construction
Work period: 2017-now
Project scope: Engineering team, Project management, Construction, HSE, Project control, IT, Quality Assurance and Control, Mechanical, Electrical, E&I, etc. Full scope of recruitment for huge construction Project.
Clients: China Petroleum Engineering Construction Corporation (CNPC subsidiary)

The scope is to recruit full scope of engineers, specialists and workers to execute construction stage of a new huge Gas processing plant in Far East of Russia.
According to the contract, СРЕСС will design, manufacture and supply equipment, as well as build booster compressor shops and gas dehydration, purification and fractionation units.
The Amur GPP with a design capacity of 42 billion cubic meters of gas per year will be the largest gas processing plant in Russia and one of the biggest in the world. The GPP will include the world's largest helium production facility (up to 60 million cubic meters per year).
Sakhalin-1 Projects FEED
Work period: 2015
Project scope: Engineering team
Clients: Fluor Daniels, SNGT (JV Fluor Daniels and Rosneft sub Design Institute)

The scope is to recruit an engineering team with relevant experience to execute FEED stage of a new LNG plant construction project and existing ENL projects.
Major gas development project located on Sakhalin Island. The gas produced will feed LNG plant on the island. The project consists of several new gas wells along with separation, treatment, and compression at the Gas Processing Unit. The project will be designed using modular concepts with fabrication of the large modules at a major international fabrication yard.