Arctic LNG-2 Project

Amur-Point LLC has been an active participant of Arctic LNG-2 Project for long now providing the professional staff for their Clients.

We continue our work in 2020 having signed a contract with SAREN, a joint venture of Renaissance Heavy Industries Russia (RHI Russia B.V.) and  SAIPEM S.p.A.

The project includes the construction of three LNG trains, with a capacity of 6.6 mtpa of LNG each, and at least 1.6 mtpa of stable gas condensate. The total LNG capacity of the three trains will be 19.8 mtpa.
16.12.2020


Last Projects

Amur Gas Processing Plant Construction
Work period: 2017-now
Project scope: Engineering team, Project management, Construction, HSE, Project control, IT, Quality Assurance and Control, Mechanical, Electrical, E&I, etc. Full scope of recruitment for huge construction Project.
Clients: China Petroleum Engineering Construction Corporation (CNPC subsidiary)

The scope is to recruit full scope of engineers, specialists and workers to execute construction stage of a new huge Gas processing plant in Far East of Russia.
According to the contract, СРЕСС will design, manufacture and supply equipment, as well as build booster compressor shops and gas dehydration, purification and fractionation units.
The Amur GPP with a design capacity of 42 billion cubic meters of gas per year will be the largest gas processing plant in Russia and one of the biggest in the world. The GPP will include the world's largest helium production facility (up to 60 million cubic meters per year).
Sakhalin-1 Projects FEED
Work period: 2015
Project scope: Engineering team
Clients: Fluor Daniels, SNGT (JV Fluor Daniels and Rosneft sub Design Institute)

The scope is to recruit an engineering team with relevant experience to execute FEED stage of a new LNG plant construction project and existing ENL projects.
Major gas development project located on Sakhalin Island. The gas produced will feed LNG plant on the island. The project consists of several new gas wells along with separation, treatment, and compression at the Gas Processing Unit. The project will be designed using modular concepts with fabrication of the large modules at a major international fabrication yard.