CHI
|
ENG
|
RU

News

SAKHALIN OIL AND GAS 2015

SAKHALIN OIL AND GAS 2015

Amur-Point Company took part at the international conference Sakhalin Oil and Gas 2015

In autumn 2015, Amur-Point Company traditionally took part at the 19th conference “Oil and Gas 2015”.

“Oil and Gas 2015” is the only event dedicated to oil & gas projects at Sakhalin and the Far East of Russia, at which top management of major companies took part. This time a huge number of participants took part in the conference.

During the conference, the companies’ representatives had a unique opportunity to get familiar with the presentations of Russian and foreign companies.

We had an opportunity to attend the following speakers’ presentations: OJSC “Gazprom”, OJSC “Rosneft”, “Exxon Neftegaz Limited”, “Sakhalin Energy Investment Company Ltd.”, “Gazprom Dobycha Shelf”, FMC Technologies, Schlumberger, Kvaerner and Baker Hughes, etc.

During every conference, we gain unique experience for elaboration and implementation of the Company business development strategy.

This year Amur-Point Company concluded agreements with the leading companies, such as American Company Fluor and Russian Sakhalin Oil & Gas Technologies.


Polina Vaschilina
15.11.2015


Last Projects

Amur Gas Processing Plant Construction
Work period: 2017-now
Project scope: Engineering team, Project management, Construction, HSE, Project control, IT, Quality Assurance and Control, Mechanical, Electrical, E&I, etc. Full scope of recruitment for huge construction Project.
Clients: China Petroleum Engineering Construction Corporation (CNPC subsidiary)

The scope is to recruit full scope of engineers, specialists and workers to execute construction stage of a new huge Gas processing plant in Far East of Russia.
According to the contract, СРЕСС will design, manufacture and supply equipment, as well as build booster compressor shops and gas dehydration, purification and fractionation units.
The Amur GPP with a design capacity of 42 billion cubic meters of gas per year will be the largest gas processing plant in Russia and one of the biggest in the world. The GPP will include the world's largest helium production facility (up to 60 million cubic meters per year).
Sakhalin-1 Projects FEED
Work period: 2015
Project scope: Engineering team
Clients: Fluor Daniels, SNGT (JV Fluor Daniels and Rosneft sub Design Institute)

The scope is to recruit an engineering team with relevant experience to execute FEED stage of a new LNG plant construction project and existing ENL projects.
Major gas development project located on Sakhalin Island. The gas produced will feed LNG plant on the island. The project consists of several new gas wells along with separation, treatment, and compression at the Gas Processing Unit. The project will be designed using modular concepts with fabrication of the large modules at a major international fabrication yard.