CHI
|
ENG
|
RU

News

CELEBRATING 10 YEAR COMPANY ANNIVERSARY!

CELEBRATING 10 YEAR COMPANY ANNIVERSARY!

On 10 July 2016, Amur-Point Company celebrated its 10th anniversary.

The Company management surprised their personnel with a unique present idea – meeting and dining at a restaurant in Saint Petersburg, where one of the Company offices is located.

The Company employees were lucky to visit a new Amur-Point office.

A celebration of this event was held at “Moscow” Restaurant.

Throughout the evening the Company’ colleagues and Directors expressed kind words and good wishes.

Over the past 10 years, the Company managed to reach new heights in staff recruitment: that is invaluable experience, new customers and projects. All this made possible by well-coordinated teamwork.

Summarizing the results of 10-year work, we believe that the most interesting work remains ahead.

The Company management team thanked all the employees who have been involved in work, and have made direct contribution at every stage of work process.


Polina Vaschilina
10.07.2016


Last Projects

Amur Gas Processing Plant Construction
Work period: 2017-now
Project scope: Engineering team, Project management, Construction, HSE, Project control, IT, Quality Assurance and Control, Mechanical, Electrical, E&I, etc. Full scope of recruitment for huge construction Project.
Clients: China Petroleum Engineering Construction Corporation (CNPC subsidiary)

The scope is to recruit full scope of engineers, specialists and workers to execute construction stage of a new huge Gas processing plant in Far East of Russia.
According to the contract, СРЕСС will design, manufacture and supply equipment, as well as build booster compressor shops and gas dehydration, purification and fractionation units.
The Amur GPP with a design capacity of 42 billion cubic meters of gas per year will be the largest gas processing plant in Russia and one of the biggest in the world. The GPP will include the world's largest helium production facility (up to 60 million cubic meters per year).
Sakhalin-1 Projects FEED
Work period: 2015
Project scope: Engineering team
Clients: Fluor Daniels, SNGT (JV Fluor Daniels and Rosneft sub Design Institute)

The scope is to recruit an engineering team with relevant experience to execute FEED stage of a new LNG plant construction project and existing ENL projects.
Major gas development project located on Sakhalin Island. The gas produced will feed LNG plant on the island. The project consists of several new gas wells along with separation, treatment, and compression at the Gas Processing Unit. The project will be designed using modular concepts with fabrication of the large modules at a major international fabrication yard.