Work period: 2017-now
Project scope: Engineering team, Project management, Construction, HSE, Project control, IT, Quality Assurance and Control, Mechanical, Electrical, E&I, etc. Full scope of recruitment for huge construction Project.
Clients: China Petroleum Engineering Construction Corporation (CNPC subsidiary)
The scope is to recruit full scope of engineers, specialists and workers to execute construction stage of a new huge Gas processing plant in Far East of Russia.
According to the contract, СРЕСС will design, manufacture and supply equipment, as well as build booster compressor shops and gas dehydration, purification and fractionation units.
The Amur GPP with a design capacity of 42 billion cubic meters of gas per year will be the largest gas processing plant in Russia and one of the biggest in the world. The GPP will include the world's largest helium production facility (up to 60 million cubic meters per year).
01.06.2017
Work period: 2015
Project scope: Engineering team
Clients: Fluor Daniels, SNGT (JV Fluor Daniels and Rosneft sub Design Institute)
The scope is to recruit an engineering team with relevant experience to execute FEED stage of a new LNG plant construction project and existing ENL projects.
Major gas development project located on Sakhalin Island. The gas produced will feed LNG plant on the island. The project consists of several new gas wells along with separation, treatment, and compression at the Gas Processing Unit. The project will be designed using modular concepts with fabrication of the large modules at a major international fabrication yard.
23.07.2015
Work period: 2015-now
Project scope: Engineering team, Project management, Project control, Project support
Clients: Kola Yard (Novatek subsidiary), Saipem
The scope is to recruit an experienced team to execute every stage of a new huge LNG plant construction project in Arctic region.
Major gas development project located in Arctic region of Russia. The new plant will be based on the resources of the Salmanovskoye and Geofizicheskoye fields, both located on the eastern bank of the Ob Bay in the peninsula of Gydan.
The construction will include yard, huge GBS, topside, and support facilities.
01.06.2015
Work period: 2012-present
Project scope: Drilling, Frac, Downhole tools, Sand control, Pressure Pumping personnel (managers, engineers, operators)
Clients: Baker Hughes, KCA Deutag, Woodgroup PSN
The scope was to recruit and supply operation and support personnel for Sakhalin-2 offshore operation project.
Sakhalin-2 is one of the biggest oil and gas projects in the world. During the project realization there were three oil rigs, OPF plant, Oil Export Terminal and LNG plant appeared.
01.09.2012
Location: Kazakhstan
Work period: 2012
Project scope: Engineers
Clients: Cameron, Cape
Kashagan — is oil and gas field in Kazakhstan, located on the north of Caspian sea. It is one of the biggest field in the world, discovered in 40 years, as well as biggest offshore oilfield.
For this project Amur-Point Company has provided personnel in HSE area and service engineers.
Please contact us for full size copies of all referee letters.
19.01.2012
Work period: 2011
Project scope: Construction engineers, project support specialists
Clients: Freyssinet Internacional
Russky bridge — is a cable-stayed bridge in Vladivostok, connecting Nazimova peninsula with Novosilsky neck on Russky island. Construction began on the 3rd of September 2008 as part of APEC construction in 2012. Stay rope were produced by Freyssinet Internacional.
Amur-Point has recruited and supplied the following personnel: HSE, QAQC, quality management (six sigma concept), construction works personnel.
24.10.2011
Location: Far East, Russia
Work period: 2011 – 2012
Project scope: Oil chemical production engineering team, support team, construction engineers
Clients: Rosneft (VNHK), Enka
Amur-Point took part in Rosneft and NK Alliance oil refinery plants construction and modernization.
For VNHK (Rosneft subsidiary) our professional recruiting team has supplied personnel in oil chemical production, power industry, HSE areas as well as administrative personnel, legal advisors, estimators.
During Khabarovsk Oil Refinery plant modernization Amur-Point was headhunting welding and QC engineers, HSE specialists for Turkish contractor Enka.
24.04.2011
Work period: 2009-2011
Project scope: Telecommunication engineers
Clients: Page Europa (General Dynamics Company), Global Strategy Group
Dubai International Airport has 60 mln. passengers and 2,1 mln. mt cargo capacity per year. Starting from 2009 Terminal 3 new building was remodeled and expanded.
Amur-Point Company has made contribution to the project by recruiting personnel in the following areas: telecommunication, project management, quality control, design.
24.09.2009
Work period: 2009-2012
Project scope: Construction engineers, managers, project support specialists, skilled construction labor personnel.
Clients: Aker Contracting Russia / Kvaerner, Schwager Davis Inc., Exxon Neftegaz Ltd. (administrative personnel)
The scope was to recruit and supply construction personnel (engineering, support and labor) to execute EPC stage of the GBS construction project for Berkut offshore oil rig.
Berkut rig is a part of Sakhalin-1 project development oil and gas production on Arkutun-Dagi field, situated 25 km far from coastline on the North-East of Sakhalin Island.
23.05.2009
Work period: 2008 - present
Project scope: Construction engineers, project support specialists, construction labor personnel
Clients: Kentz Russia / SNC Lavalin, Kentech Sakhalin, Orengroup holding, ECC VICO, CH2M, SMNM, Cameron, Panalpina.
The scope is to recruit and supply construction personnel (engineering, support and labor) to execute EPC stage of the project extension.
A flowline transports the Odoptu field's oil and gas to the Chayvo Onshore Processing Facility, from which oil is sent to the De-Kastri Terminal for tanker shipment to the international market and gas is stabilized for either domestic supply or reinjection into the field to maintain reservoir pressure.
23.05.2008
Work period: 2006-2014
Project scope: Construction engineers, managers, project support specialists, skilled construction labor personnel
Clients: Nippon Steel NL, KXM (Koksokhimmontazh), ASC, Champion Technologies (NALCO)
The scope was to recruit and supply construction personnel (engineering, support and labor) to execute EPC stage of both the oil terminal construction project (including tanks construction) and pipeline construction project. Engineering support was also provided for operation stage.
At the pipeline and oil terminal construction project Amur-Point has provided headhunting for the following areas: HSE, environmental control, quality control, planning and cost control, construction, translators and designers.
For the whole project Amur-Point search and supply personnel in construction sphere, land and coast survey, metrology, administrative personnel, design, project management, Electrical and Instrument, QC, HSE, logistics.
24.10.2006
Work period: 2006-2008
Project scope: Construction engineers, project support specialists
Clients: Starstroi, Royal Haskoning, Sodexo, LoTrans.
The scope was to recruit construction and support personnel for Sakhalin-2 LNG, OPF plant and pipeline construction project.